Insulation brick construction process
Date:2015-05-11 17:31 From:Zhengzhou Sunrise Refractory Author:admin
1, insulation bricks before clamping should first make insulation bricks in a stable position to be caught in the jaws clamp insulation brick center line.
2, remove and place for insulation tiles should be smooth and free of debris. When the insulation bricks in place, should be insulated bricks put stability before they release the clamp. When insulation tiles lifting hooks must not stand on the bottom or other operations insulation bricks.
3, insulation brick construction, the body may not be standing masonry wall, crossed other operations. When using the scaffolding, safety nets should be set up around the house facades, and with the construction of a gradual ascending height; layer of safety net under the eaves, the project is not completed before the roof must not be removed.
4, has been in place Silica Hot Repair and Mortar , filling vertical joints must be carried out immediately, the window between the poor stability of walls, columns and pick the wall more independent parts of the external walls of fire insulation materials, should be added to the temporary stable support.
5, the insulation brick brick, not wind cable pulling rope, not hanging heavy objects should not be implemented as other temporary construction and support of the anchor if it proves necessary in the masonry, construction should take effective measures to concrete insulation bricks.
6, mortar pump before use, should be checked. When operating, the pressure should be required to carry out, and wear protective labor supplies.
2, remove and place for insulation tiles should be smooth and free of debris. When the insulation bricks in place, should be insulated bricks put stability before they release the clamp. When insulation tiles lifting hooks must not stand on the bottom or other operations insulation bricks.
3, insulation brick construction, the body may not be standing masonry wall, crossed other operations. When using the scaffolding, safety nets should be set up around the house facades, and with the construction of a gradual ascending height; layer of safety net under the eaves, the project is not completed before the roof must not be removed.
4, has been in place Silica Hot Repair and Mortar , filling vertical joints must be carried out immediately, the window between the poor stability of walls, columns and pick the wall more independent parts of the external walls of fire insulation materials, should be added to the temporary stable support.
5, the insulation brick brick, not wind cable pulling rope, not hanging heavy objects should not be implemented as other temporary construction and support of the anchor if it proves necessary in the masonry, construction should take effective measures to concrete insulation bricks.
6, mortar pump before use, should be checked. When operating, the pressure should be required to carry out, and wear protective labor supplies.
Send an Inquiry
E-mail : sales@sunriserefr.com
Phone : +86-371-63838939 / Fax:+86-371-63835539
Company Address : No.36 Fengchan Road Of Zhengzhou, Henan, China (Mainland)
If you have any needs our help or are interested in our products, you can click online advisorychat with us online, or call our customer service telephone: 0086-0371-63838939. We will sincerely serve for you!
Product Category
- Fused Cast AZS
- Fused Cast AZS Block
- Fused Cast Skid Rail Block
- Fused Cast High Zirconia Block
- Fused Cast AZS Block
- Fiber Products
- Insulation Series Brick
- Fireclay Brick
- High Alumina Brick
- Corundum Brick
- Sillimanite Brick
- Mullite Brick
- Zircon Mullite Brick
- Zircon Brick
- Magnesia Brick
- Silica Brick
- Fused Cast Alumina Block
- Glass Mould Brick
Refractory Knowledge
moreCase
-
UAE to our factory inspection bri
...
-
Venezuela customer AZS fused bric
Venezuela customer AZS fused float glass furnace br...