AZS Ramming Mass AZSM-05
Date:2017-09-30 09:20 From:Zhengzhou Sunrise Refractory Author:sunrise
Open the bag to check if the coagulant agent is dampened or hardened, and then spread the coagulant agent uniformly into the bag;
Mix certain amount of the mass according to on-site assumption. When it mixes well, add room temperature water by a ratio of 6-7%, or adjust the ratio according to local climatic condition and water content of the mixture. Blend it till there is no raw ramming mass left or till that it will break into pieces instantly when it falls to the ground after one unlooses his grip of the mass from the height of 0.33 meters;
The construction site and bonder should be clean and without sundries. The leftover well-mixed mass should be covered with plastic sheet film or placed in shady and cool place. The mass that is not dry and hard can be used again; otherwise, it should be crushed and used together with other raw material or abandoned.
Mix with water to make the material like slurry then press smooth by vibrating.
CONCRETING TIME: BEGINNING TIME: 0:15~2:00 HOURS
FINISHING TIME: 3:00~6:00 HOURS
HEATING TIME: AFTER 150:00 HOURS
THIS MATERIAL IS WITHOUT PHOSPHORUS,AND DOES NOT POLLUTE THE ENVIROMENT.
Mix certain amount of the mass according to on-site assumption. When it mixes well, add room temperature water by a ratio of 6-7%, or adjust the ratio according to local climatic condition and water content of the mixture. Blend it till there is no raw ramming mass left or till that it will break into pieces instantly when it falls to the ground after one unlooses his grip of the mass from the height of 0.33 meters;
The construction site and bonder should be clean and without sundries. The leftover well-mixed mass should be covered with plastic sheet film or placed in shady and cool place. The mass that is not dry and hard can be used again; otherwise, it should be crushed and used together with other raw material or abandoned.
Mix with water to make the material like slurry then press smooth by vibrating.
CONCRETING TIME: BEGINNING TIME: 0:15~2:00 HOURS
FINISHING TIME: 3:00~6:00 HOURS
HEATING TIME: AFTER 150:00 HOURS
THIS MATERIAL IS WITHOUT PHOSPHORUS,AND DOES NOT POLLUTE THE ENVIROMENT.
Send an Inquiry
E-mail : sales@sunriserefr.com
Phone : +86-371-63838939 / Fax:+86-371-63835539
Company Address : No.36 Fengchan Road Of Zhengzhou, Henan, China (Mainland)
If you have any needs our help or are interested in our products, you can click online advisorychat with us online, or call our customer service telephone: 0086-0371-63838939. We will sincerely serve for you!
Product Category
- Fused Cast AZS
- Fused Cast AZS Block
- Fused Cast Skid Rail Block
- Fused Cast High Zirconia Block
- Fused Cast AZS Block
- Fiber Products
- Insulation Series Brick
- Fireclay Brick
- High Alumina Brick
- Corundum Brick
- Sillimanite Brick
- Mullite Brick
- Zircon Mullite Brick
- Zircon Brick
- Magnesia Brick
- Silica Brick
- Fused Cast Alumina Block
- Glass Mould Brick
Refractory Knowledge
moreCase
-
UAE to our factory inspection bri
...
-
Venezuela customer AZS fused bric
Venezuela customer AZS fused float glass furnace br...